 |

|
| |
 |
 |
| These images (with colourised versions) date from the 1970's, and show the engineering works and the tripod dockside crane used for the pontoon works. (the taller crane is a portable crane in use at the engineering works) The level of the dock is reduced and some of the eight slots, required in the northern quay wall bear witness to the former location of the pontoon shore connections. The offices of the works and its distinctive clock tower, sit at the edge of the dock on the vertical quay walls which were in total 47 feet (14.3 m) high. Where's the pontoon disappeared too? You'll have to wait and see! [069] |
|