Penarth Dock, South Wales - 150 years - the heritage and legacy  
Penarth Dock, South Wales - the heritage & legacy . . .

Volume Ten - Pre-Victorian to the Present Day - Even more aspects - Investigation into the Condition of the Ely River Subway 1991 . . .

Plate 3/7 - Ring 110 - Lower right segment. Severe lamination of fixing nut.

• Plate 3/7 - Ring 110 - Lower right segment. Severe lamination of fixing nut.

 
Plate 3/8 - Ring 130 - LHS of Subway. Indication of water level on Subway linings prior to pumping out.
• Plate 3/8 - Ring 130 - LHS of Subway. Indication of water level on Subway linings prior to pumping out.
© 2014 - 2025 - penarth-dock.org.uk - all rights reserved - web design by Dai the Rat