Penarth Dock, South Wales - 150 years - the heritage and legacy  
Penarth Dock, South Wales - the heritage & legacy . . .

about . . .

Volume Six - Pre-Victorian to the Present Day - Select Aspects - The subway under the river Ely story . . .

     
 

I thought it approriate to include a selection of the images from the report since they add to the construction details and provide a insight to the condition of our lost engineering and social heritage after 76 years service and a further 25 years of flooding (to 1991).

Since then, the subway to my best knowledge has remained flooded. The report of 1991 commented that should the subway be abandoned, then the recommendations of the report included the following items;

(i) to demolish the toll house on the northern side,

(ii) to remove 90 rings from the same side (41m) to ensure that the structure does not project above the proposed development level,

(iii) to locate the abandoned southern end of the subway and cap it off properly and,

(iv) to install manholes at each end of the remaining subway to enable access to present or future services and that the subway be retained as a service tunnel.

Home
About
Contact

contents . . .
Introduction
Contents

information . . .
Search this site
Contributions
Links
Recent Updates

150 years of Penarth Dock History and Heritage

© 2014 - 2025 - penarth-dock.org.uk - all rights reserved - web design by Dai the Rat